Tuesday, December 14, 2010

Does Everyone Masterbate?

3 º Encuentro Nacional



neighboring Outstanding participation in the choice of works



(City Press) - A total of 4446
neighbors flocked to the polls on December 12 last Sunday to participate in choosing the program works PB 2011, which drives the mayor Juan Pablo de Jesus since last year .

The announcement of the numbers of participation and the election result was announced by the Mayor at a press conference where the president also expressed his joy and gratitude
by
"There was participation at meetings."

In this sense, the village head said that as a tool for citizen participation, the participatory budget
"is a program that allows us to generate identity with the place."

"Beyond having a number of benefits, because we are closer, because the neighbors are heard, and others, also have the kindness that generates identity with the place and creates ownership public space and public works, "said the president
.
He added
in this sense,
"I am sure that the work we are doing with the PB will be highly valued by the community, especially when they may have life, and embrace them as their neighbors."
worth noting that this time,
the Partido de La Costa was divided into 13 jurisdictions and there were 3 meetings by jurisdiction, which involved a total of 4,900 residents. A figure that far exceeded last year's attendance, when there were about 3,500 residents in the four meetings that were held by jurisdiction (three fewer than this year), and 2,500 neighbors the instance of the vote.
For this edition, the total amount allocated for the completion of the works is 7,500,000 pesos
. 50 percent more than the amount allocated
last year, which reached 5 million.

Notably, this year the town of Aguas Verdes recorded the highest share of residents in the percentage of the electorate. In this case, the city surpassed even their pattern with a large attendance of nonresident owners took to the polls. In total, during the day there were 248 voters, and Aguas Verdes has a register of 200 voters. It is estimated that about 60 residents participated nonresidents.

For its part,
San Bernardo was the locality with the largest share in terms of total number of voters, with 641 residents who were protagonists
.
Notably, where the winning project will not consume the total amount available to the jurisdiction, the money will go to the completion of second and third draft. This is the case in the town of San Clemente, which according to anticipated the municipal president, will be included in the amount of PB 2011, the second draft of the basketball court on the same site where the construction of the Center for Social Inclusion voted in the first place, and the case of San Bernardo, which include Construction of Sports in the San Cayetano, elected in second place after the renovation of lighting in Chiozza Av.
Below are the results of the voting jurisdiction:

San Clemente

Amount allocated: $ 1,125,000

Number of Voters: 527
First Place: Center for Social Inclusion, Cultural, Educational and Sports, located at the site where there is the heated swimming pool and future technical school. (392 votes)
Second place: Indoor Basketball Court *

Third place: ramps on the sidewalks in downtown. Runs to the sea.
* be included in the participatory budget
2011

The Dolphins
Amount allocated: $ 600,000
Number of Voters: 307
First Place: Widening and reform of the entrance. Avenue to Route 26. (202 votes)
Second Place: gutters: the Diagonal Street B and 40

Third place: Lighting: Avenue 26, Avenue 23, Diagonal A and waterfront .
Santa Teresita
amount allocated: $ 1,125,000

Number of Voters: 529
First Place: Sports in The Quarter Quintas, with Skate rink. (290 votes).
Second Place: Versatile Cultural Center and Museum.

Third Place: Heated Pool Golf Park neighborhood.
Tuyú Sea
Amount
for: $ 600,000

Number of Voters: 631
First Place: Improving Costanera Avenue from 81 Street to 87, with lighting and benches. Beach straight downhill from the street 71 to 50, and 82 streets, 83 and 84. (285 votes)
Second place: Improvement of tickets to Sea Tuyú

Third Place: Street signs and road signs.
Costa del Este
Amount for: $ 300,000
Number of Voters: 228
First Place: pedestrian trails 2 of Costanera Avenue to the road and Las Camelias between 1 and 3. (123 votes)
Second Place: bike lanes on the East Coast Sea Tuyú

Third place: Runs to the beach
Aguas Verdes Amount
for: $ 200,000
Number of Voters: 248
First Place: roofing and cladding of playón sports. (140 votes)
Second Place: Entry Gate

Third Place: Parador access. Shelters.
Lucila del Mar
amount allocated: $ 200,000
Number of Voters: 44
First Place: Construction of Skate rink plaza Manuel Belgrano. (36 votes)
Second place: police checkpoint

Third place: Runs to the beach
Costa Azul
Amount
for: $ 200,000
Number of Voters: 151
First Place: Runs a beach in Alberdi, Duhau and Urquiza. (113 votes)
Second Place: Coastal Pedestrian Path

Third Place: Plaza Remodel
27
San Bernardo
Amount for: $ 1,125,000

Number of Voters: 664
First Place: Renewal of luminaries from Forced to Chiozza Av Belgrano. (323 votes)
Second Place: Sports in the San Cayetano *

Third place: Ramps, more games circuit with square
* be included in the participatory budget 2011

Mar de Ajo North
Amount allocated: $ 450,000
Number of Voters: 303
First Place: Gordon ditch around the School and Community Center. Entre Rios Sarmiento from San Juan Madariaga, Belgrano, Rivadavia, San Juan de Jujuy. (246 votes)
Second Place: playón enclosures and illumination of the

Third Place: Plaza
sports court
Mar de Ajo Center
Amount allocated: $ 900,000

Number of Voters: 422
First place: second stage of the work of the Park General Lavalle, including a nursery-school construction two curves wider cycling circuit. (402 votes)
Second Place: Runs to the beach

Third place: Lighting
Villa Clelia
Amount allocated: $ 450,000

Number of Voters: 265
First Place: Gordon gutter: Falucho from Azopardo Blanco Encalada, La Margarita, Estanislao del Campo, from street Azopardo Pueyrredon and Anchor. (153 votes)
Second Place: Home of day for seniors

Third place: Renovation of the Plaza Eva Perón
New Atlantis
Amount for: $ 225,000

Number of Voters: 127
First Place: Porch entrance, with beautification, reforestation and maintenance of Roland Ave. (114 votes)
Second Place: Runs a beach ramp.

Third Place: Street signage and road signage and tourist.
http://municipalismoydesarrollolocal.blogspot.com/

0 comments:

Post a Comment